Showing posts with label Fat Quarter Stars. Show all posts
Showing posts with label Fat Quarter Stars. Show all posts

Monday, February 17, 2014

Weekly Progress - BOMs and UFOs

This week was a mixture of finishing and some block work. I'm still trying to settle on a good day to do my monthly BOMs...first Monday seems obvious, but...it just hasn't happened the first couple of months.

BOM
This is the 13th 12" block for the Fat Quarter Stars. I made the hourglasses before and decided not to use them because there wasn't any of the background fabric. I'm still not sure...but it's a block. And I found my list, so I can go ahead with the 9" blocks while I ponder this one.

Quilt Doodle Row-Along - I shrank the house block down to 10" to fit my plan. I think it will need a button wreath of some sort on the door!

And my weekly churn dash - it's really much brighter than the photograph! This was used as part of a dress for my niece, and it's just a very cheerful pink.

Finishes

The wind was disagreeable for getting a good picture, but the Vera Bradley quilt is pieced. I'm backing-hunting and quilting this week!

And since I was on a roll, I put the borders on the Chunky Log Cabin. When I finished the top, I swore I was going to keep going until it was done...in November...2012... But I already have the backing, so this time, I swear, it's high on the quilting list.

Piecing
I prepped the binding for Four Patch Frenzy, so that will get done this week.

And finally, the Reverse Heart project. It's been a leader/ender, so progress is slow, but slicing willy-nilly through my pink scraps has been fun.

I also stole back a storage table from the office and emptied two boxes of UFOs. Sure, technically it's just moving them from one holding place to another, but it's open wire bins. I can see them a lot better {and feel guilty} and they're separated out into their levels of done-ness. And I don't have to go digging through boxes trying to decide what to do next. So hopefully that will help move some projects to the done pile in the near future.

Linked:

Monday, January 20, 2014

Weekly Progress - Finishing Machine

What do you do when you used to devote hours to running and now you're firmly in your taper?

A lot of sewing.

This coming week will be even more productive in the sewing room, with a whole three miles to run and no strength or cross training. Oh, and a measly little half marathon at the end of the week.

Finished


Piecing
Pieced the inside and started on the borders. Are those borders? When you're continuing part of a design into the first border, does it really count?

These are my very oldest scraps - my mother made dresses out of this material when I was in middle school. Let's just go with over twenty years old. I wore the dress to a handbell concert in Washington DC, and fell off the stage at the Old Post Office. Ah, memories.


Fat Quarter Stars
It's hard to come back to a project like this when you can't remember where you're at. I don't remember if I'm done with the online quilt along, where my list of the 9" stars is, and...so I made this star. At some point before next month, I'll try to figure out where the heck I am with this project!


Quilt Doodle BOM
And then I started a new BOM. Technically, it's a row-of-the-month hosted by Quilt Doodle, but she said it's winter-themed, so I'm hoping to make one block a month for a January-ish wall hanging for my mother. The blocks are 10" and the wall hangings are supposed to be about 30x40", so it should work out.

Obviously Mr. Snowman will be getting button eyes.

And Celtic Solstice is still a leader/ender project. I went back and forth on turning the chevrons to make a star, and not piecing the second block until I was really sure. But after seeing other people post their various versions, I'm sure I want the star. So here it is!


Linked:

Monday, October 22, 2012

Weekly Progress - On UFOs

I have not started anything really new in ages. But I need to get somewhere with all these projects before I can start something new!

T-shirt quilts are not very creative. But they force me to be very precise in piecing. And they pay for more creative quilts.

Design Wall - LQS Saturday Sampler 2011
I'm working on this because I have to - it has a date with the long arm and needs to be in a box by Christmas. But all that white space and the simple layout makes the blocks pop.

Grandmother's Choice, block six. I like this one. I don't like #7, and I really don't like #8. But this is a BOW about choice. So...I'm going to do the blocks I like, and appreciate the work the designer put into each week even if I don't make the block.

 Fat Quarter Stars - I made two 12" blocks - Weather Vane and LeMoyne Star - from my shop hop collection. Then I figured that if I was going to get my sister's block book back to her, I should start doing those. So, my first 9" block - Air Castle.
Technically, Weather Vane and Air Castle aren't stars, but they are kind of star-like.

UFO Busting
 Oh, Skorca! I mowed the backyard on Sunday to put off quilting this UFO...talk about a bad sign. I think I need something different than one UFO day a week - because I will come up with a hundred excuses to not sew that day! This week, I'm going to try quilting for an hour each day. That should, hopefully, take care of Skorca, and then maybe I can move on. 

Fifteen Minute Challenge - Organization
 I only folded fabric once in the past week. The cutting table? Covered. The sewing table? Piles on the corners. Felt boxes are on the floor from a kid craft project, I have a giant basket of t-shirt scraps... I need to DO my 15 minutes this week!

Oh, and my other deadline project. Crazy as the idea was, this is actually coming along nicely. The base of the costume is done - now I'm adding the layers. 

Linked:

Tuesday, September 11, 2012

Weekly Progress - Block Party

I am still in the middle of a large t-shirt quilt project, so my normal sewing was limited to random blocks, even though I spent plenty of time at the machine this week. {And plenty of seam-ripping time. Sigh.}

Fifteen Minute Challenge
I did my fifteen minutes of pressing three times this week! Which doesn't make for much progress. I did graduate to a larger box, though, so I'm getting there.

Design Wall
 
All the four-patches are up, and the pinwheels are starting to fill in. I actually have a pile of them to press and trim...I just don't want to!

Progress:
 {Rob Peter to Pay Paul - which I thought was a curved block?}
{Windblown Star - which I really wanted to like, but I killed the points on every single flying goose}
LQS Saturday Sampler 2012 (21/36 blocks)

Boardwalk - five blocks done!


Fat Quarter Stars (7/? blocks) - I always intended to mix blocks from my 2011 Shop Hop Sampler with the Fat Quarter Stars. So I finally sat down, looked through the patterns, and did!
A few of them need to be re-drafted to the proper size, and a few won't work at all, but this 12" log cabin star was the perfect restarting point.

 
Grandmother's Choice (1/2 blocks) - block one, I loooooooove. Block two, I haaaaaaaate. I'm going to try paper piecing it, with different color selections, because it came out so very bad.

No Progress:
LQS Saturday Sampler 2011 (12/12 & center)
Chunky Log Cabin (13/20 blocks)
St. Paul's Cross (2/42? blocks)

Quilting/Basted: 

Adoption:
Application Submitted - 2/12 
Home Study - approved 5/12
USCIS paperwork - mailed 6/12
Home Study to Korea - 6/12
Referral Accepted - 6/12

New Projects: 0
Completed Projects: 0

Wednesday, March 14, 2012

FMC/WiP - Deep Breaths

Early spring/no winter means the cottonwoods are in full bloom very early this year, and it's killing me. Literally. My trachea is about as big as a pin. If I tilt my head down or up more than 45 degrees, I can't breathe. Fun times.
I told my husband I was allergic to deployments. He didn't think I was funny. But he did hide the chainsaw when I threatened to cut down my neighbor's cottonwood tree.

Fifteen Minute Challenge - nothing really to show. I've been spending 15 minutes a day cleaning the sewing space, sorting patterns, folding fabric, etc. Since all my patterns are currently (sorted!) on the floor, it's at the "things look worse before they look better" stage. 
On the plus side, you can see the top of my Necchi sewing table! (Which the cat promptly started sitting on.)

Quilt-Alongs: 
Fat Quarter Stars - 6/12 blocks - blocks 6 and 9. I cheated on 6 - didn't want to make a Cathedral Window - so I faked it.
LQS Saturday Sampler 2012 - 6/36 - new blocks to make
LQS Saturday Sampler 2011 - Blocks 10 & 12! I really like 12 - I think it's my favorite of the bunch. Now that I'm finished with the BOMs, it's time to start putting together a quilt.
Quiltville Orca Bay {Skorca!} - I couldn't find a blue for the border until Sunday, so it's slowly getting borders. The penguin border is directional, so I had to do math and careful cutting to get them facing the right direction.
Swoon A Little, Swoon A Lot - no new blocks - I can only do so many intense piecing blocks a week!
Granny Squares - yeah, I know, another quilt-along. Shush. I need to make a quilt for my cousin's baby, and she gave me free range, and I'm so over making stars right now. I'm making granny squares with a "special" center - minkee, fur, flannel, corduroy, etc. I tried to be careful and not get near the minkee, but, um, not careful enough. Oops.

Untouched This Week:

Awaiting Quilting:

At the Quilter's:

Adoption:
Application Submitted - 2/12 
Home Study - in progress 

New Projects: 1
Completed Projects: 0
In Progress: 16

Wednesday, February 22, 2012

WiP/FMC - Life in Progress with the Military

The first bit here is going to be a bit heavy, so just scroll down to the pictures if you don't want to read about life.

So... We're in the process of adopting from Korea.
{I know. I talk about it A LOT.}
But then my husband was put on a deployment list, and we put life on hold. Then he went on from the deployment list to the moving list, so we rushed to finish up the last bits of paperwork.
Then...
{I bet you know where this is going...}
Yeah. He's deploying.
I threw a bit of a hissy fit. We've put off the adoption process for five years, and this specific adoption for six months, because of the military holding us in limbo.
Cried. Prayed. Called our agency.
They rock.
The application is in, and the home study starts immediately, so that everything can be sent to Korea before he leaves.
And then the Dude and I have a lot to look forward to - Daddy and a brother/sister coming home in the winter/spring of 2013.
{And then we move.}

Anyway, on with the WiPs!

Fifteen Minute Challenge - still Sew Starry. Who would have thought cross-hatching would take so darn long? Anyone who only did it for fifteen minutes a day, probably.
I quilted it for fifteen minutes every day except Monday (road trip to Stillwater!)
I want to get it squared and bound today, so it's time to pick a new FMC!

I'm making my first mini-quilt for the Ellison Lane contest. It is not modern - built from log cabins and courthouse steps - but it's something I've wanted, so... I'm making it! Any guesses?

Quilt-Alongs:
Fat Quarter Stars - 6/10 blocks - skipped ahead to #9 because I'm out of background fabric. LOVE this one. So simple but so cute.
Plus, look how cute the bonus triangle from the flying geese is! It's going to make a great couple of pinwheels.
LQS Saturday Sampler 2012 - 3/36 (new blocks to work on)
 
Quiltville Orca Bay {Skorca!} - lots of blue filling in... I'm so ready to start assembly!
Made in Cherry - see above
Swoon A Little, Swoon A Lot - the blue box? That's my Swoon fabrics... (Newest block to the side.)

Wednesday, February 1, 2012

WiP/FMC - Seeing Stars

Big progress on the star quilts on my list this week. In fact, if you consider Swoon a star, that's pretty much all I did.

First, for the Fifteen Minute Challenge, I pieced together Sew Starry's remaining points on Wednesday-Friday, pieced the two middle sections together and figured the math for the solid pieces on Saturday, cut the solid on Sunday, and pieced it together Monday-Tuesday.
How easy is that? Fifteen minutes a day for two weeks, and I have a wall hanging for my sewing nook. That still needs to be quilted... Or maybe a border first?

I have seven rows finished on my sister's Hunter's Star - and more importantly, I cut 120" strips for borders. Continuously. It was a little terrifying - if I slipped up, I would have ruined a LOT of border. But I didn't, and I'm close to the assembly stage!
{lots of trimmings}

Quilt-Alongs:
Fat Quarter Stars - 5/9 blocks - #5 redone this week - my original had too much print. I replaced it with neutral and, eh. It's okay. It's just not very exciting. Maybe the quilt will need a not-very-exciting star.
LQS Saturday Sampler 2012 - 3/36 (caught up so far)
LQS Saturday Sampler 2011 - 10/12 blocks
Quiltville Orca Bay {Skorca!} - almost all of the Ohio Stars assembled!

Wednesday, January 25, 2012

WiP/FMC - First Rows of Hunter's Star

I like this quilt, but man, does it involve a lot of trimming. Strip piece the star point, trim; strip piece the other star point, trim; square that piece, add the triangle, add the other (trimmed) side, trim...
But hey - two rows! (And 72 blocks to trim.)

For my Fifteen Minute Challenge, I'm still waiting on my mom to make a decision on sashing for Frolicking Pinwheels, so Sew Starry became my FMC this week.
I pieced each section in fifteen minutes every day - two halves of the center on Wednesday and Thursday, star side pieces on Friday-Tuesday. I'm on track to finish the star pieces before the next set of instructions come out - yay for 15 minutes of daily dedicated work!

This website was on the Quilting Gallery yesterday, so I started making a couple four-patches with the whites I'm using in Skorca! and the leftovers from Sew Starry. 

Quilt-Alongs:
Fat Quarter Stars - 4/9 blocks - #4 finished this week
LQS Saturday Sampler 2012 - 3/36 (caught up so far)
LQS Saturday Sampler 2011 - 10/12 blocks
Quiltville Orca Bay {Skorca!} - slowly adding pieces to Ohio Stars...slowly...
Made in Cherry - see above :)
Swoon A Little, Swoon A Lot - not only did I work on a layout on Monday, but I finished a block for the first time since November!


Linked: