Man, this short month went a bit too fast! Who ever decided that February should get shortchanged? Darn you, Caesar! What was so wrong about making January, February, and March all 30-day months?
Family: We got orders! Surprisingly early! Back to Fairchild AFB, WA. There are a lot of mixed feelings about this...but at least the place makes us happy. We'll move sometime this summer - school doesn't start until after Labor Day {and Oklahoma gets out before Memorial Day} so we have a lot of time to work with.
Adoption: Still waiting to hear the revised timeline and requirements...and trying not to worry. I'm hoping we know before we schedule the move - obviously, it would be nice to be settled before the Little Man comes home.
Running: Little Rock Half is this weekend, and I feel insanely prepared. At some point, full marathon training stopped being tiring and started being, "oh, no biggie, I have a 2:30 long run this weekend. AND I WILL DO IT IN 2:20!!"
Sewing: I planned, this month, to...
Quilt Star Wall Hanging and Layer Cake Snowballs
Pick 16 Saturday Sampler blocks to set on point and do that
Yes! Not only that, but all the on point blocks are sashed and I started putting together the other blocks. And then I ran out of fabric. Man, when you have a lot of negative space, you need a LOT of that fabric!
Figure out what I'm doing with Boardwalk and make at least ten blocks
Yes, I'm up to nine blocks. And out of space on the design wall, again! Four more to go...I think. I should really come up with a plan...
And then also...
Starburst Pillow - I love it! I'm really glad I decided to make it pillow-size. Now I can enjoy it instead of letting it linger on the to-be-quilted pile.
Rainbow Scrap Challenge - ten cute little purple blocks!
And then there's my NewFO. I did not plan on a NewFO this month. I blame my mother-in-law - she ordered me quilt magazine subscriptions for Christmas. I couldn't resist making this one in Flirt!
As for March...it's got Spring Break and two half marathons, so I'll try not to be overly ambitious.
1. Keep up with Cat Tails - I should finish the cat blocks and have them ready to set in April.
2. Quilt Star Wall Hanging, Frolicking Pinwheels, and Skorca. {I know, three. But two are small and should not take that long! And I know I'm going to keep putting Skorca off.}
3. Make a new Creeper pillow for the Dude's birthday. {The first one went to a friend. The second will be properly pixelated.}
4. Make at least half of the fourteen remaining blocks for Boardwalk. Luckily, they're all blue/teal, so the pink will be balanced.
Linked: