Showing posts with label Triple-Zip-Along. Show all posts
Showing posts with label Triple-Zip-Along. Show all posts

Tuesday, February 19, 2013

Weekly Progress - the Creeping Crud

Yesterday was a day off, so I forgot all about posting. It doesn't help that my husband and I both have the basic winter-y sinus crud, so I barely got anything done this week. So this will be short and sweet before my next nap. I hate being sick!

{Finished} Triple Zip Pouch

{Design Wall/BOM} I finally decided to trust my math {after triple checking it 4x} and started setting Saturday Sampler. I need to pick four more from the top to set on point - there's also four in progress by the sewing machine.

{Fifteen Minute Challenge} I finished organizing the Christmas scrap bin, including yardage and fat quarter sets. It's ready to {sadly} be packed away until after the move.
I then pulled out my solids bin and fished out any black that could be used for the Sampler, then moved to the green scrap bin for organizing. There's another Creeper pillow in my future.

So...really slacking on the UFOs this month. At least I haven't added anything to the to-be-quilted pile other than the Starburst pillow, which is ready to quilt once I can sit up longer than five minutes.

Linked:

Friday, February 15, 2013

Triple Zip - Finished!

Whew - I survived three zippers!




One thing I did differently from the tutorial was leave my tabs uncut until the end. I found it was easier to start sewing in the to-be-cut-off zone. Even still, I broke a needle going through the zippers. {Argh!}

I also used a firm fusible interfacing from my stash instead of fusible fleece. I think it's stiff enough as is!


I read both endings about a million times, and I still didn't do it right. I couldn't tell where to start/stop sewing to make nice corners - mine are, well, less than perfect.


But hey - it fits my electronic essentials!

Fabrics:
Dear Stella Bukhara
RJR Fabrics Momma's Apron Strings
Japanese print scrap
Interior pockets - muslin

Linked:

Monday, February 4, 2013

Weekly Progress - Super Bowl Style

Or lazy Super Bowl style. Didn't care about the teams this year, so we put very little effort into the food {more free time!}, went to a party at someone else's house {no cleaning!} and I spent half the game hand-stitching my hanging sleeve on Two of Hearts.

Oh, and I pulled together a giveaway. You might want to check it out. You know, if you like free stuff.

{Finished} The Olivia Schnibble - went with fast quilting and completed it in less than an afternoon.

{BOM} Finished the last three for Saturday Sampler!

{Design Wall} And here they all are! I need 16 on point, so I'm starting by picking one from each colorway. I also worked on the math for the setting during the Super Bowl.

{Starburst Quilt Along} Laid out my block to start sewing...hmmm... I appear to have miscalculated something.

{Triple Zip Along} Bought my three zippers. Still being a complete chicken about putting it together.

{Cat Tails} Sorted out the colors I have and counted. I had to cut out one more red block, but this will leave me with eight blocks to make and 13 total.

{Boardwalk} I decided to use the remaining pink fat quarters for the setting triangles, so I cut those and used the leftovers to prep a couple blocks.

{Fifteen Minute Challenge/Rainbow Scrap Challenge} I slacked off in the beginning of the week, but when the RSC turned purple, I grabbed the box and got to sorting. Friday/Saturday was sorting, Sunday I cut the pieces for the RSC. All ready to be leaders/enders this month!

Monday, January 28, 2013

Weekly Progress - Now With Husband!

And man, husbands slow down progress... Still, it's good to have him back. For one thing, I've been getting up at 6 am to run, so then I have the entire day to do other things! Like sit on the couch and complain about how much running hurts.

I did manage two finishes this week. Though both were nearly done last week, so it's not all that impressive that I managed to put binding on in the course of a week. Posts coming...soon. Along with a giveaway for 100 followers. I promise.



In other spurts of productiveness...

{Triple-Zip-Along} I cut out the main body fabric, making use of my newly-created string box. All the zipper pulls will be the same Dear Stella as the main body, because I had 2.5" strips leftover from binding, and this is a use-what-you-have project.
Still haven't decided if I'm using muslin or something else for the lining. And I need to buy zippers because I don't keep any on hand.

{Starburst Quilt Along} Flying geese made!

{Cat Tails} Block #4 is done, a bit late.

{Boardwalk} Catching up on the couple of blocks left for January. The little pieces on the strips of white a directional, so I chain piece them instead of leaving them as leaders/enders. Otherwise I forget which way they go!

{Saturday Sampler} First of the last three! Two and three are cut and well on their way to done.

{Design Wall} Sometimes I give up waiting for the right light.

I'm about to the point where I need to calculate the needed yardage to set the blocks on point and get this thing finished up!

{Fifteen Minute Challenge} Totally slacked this week. I shoved all the boxes back on the shelves with no organization, so that there was no fabric covering the bed when my husband got home. I swear I'm getting back to it this week!