Showing posts with label swap. Show all posts
Showing posts with label swap. Show all posts

Tuesday, August 21, 2012

Weekly Progress - On Our Own

We dropped my mother at the airport last week, and now the Dude and I are fully on our own. It's a good thing school starts this week, because he is already bored of me!

I have been unpacking slowly and doing a sewing space overhaul at the same time, which has led me to a new Fifteen Minute Challenge - pressing and folding all my fat quarters {and semi-FQ shaped pieces} the same way. 
So far, I've only done it Friday/Saturday/Monday, and I have a pretty big pile to work through. So for fifteen minutes, every day, before I start sewing...press and fold.

Progress:
First thing I unpacked was my Picture-Perfect Polaroid Block Swap fabric, and finished them up only two days late.

{my favorite}

{except maybe this one, with the bunnies photo-bombing...}

 Next, I whipped through my Wrapped in Hope quilt. The kid requested "Marvel heroes, red and black." I think I nailed it! I have all the rows sewn together now, and as soon as I figure out backing, it will be basted.

And finally, I finished the sashing on Central Park Sudoku. It's not done - I want to add a skinny and a wide border - but that will have to wait until my shopping list is complete.

No Progress:
Fat Quarter Stars (6/12 blocks)
LQS Saturday Sampler 2012 (15/36 blocks)
LQS Saturday Sampler 2011 (12/12 & center) 
Chunky Log Cabin (13/20 blocks)
St. Paul's Cross (2/42? blocks) 

Quilting/Basted: 
Layer Cake Quilt Along 

Joining:
Vintage Holiday Quilt Along - another one for the shopping list. I have piles of Fairy Frost...but none for background!

Adoption:
Application Submitted - 2/12 
Home Study - approved 5/12
USCIS paperwork - mailed 6/12
Home Study to Korea - 6/12
Referral Accepted - 6/12

New Projects: 1
Completed Projects: 0
In Progress: 12

Tuesday, August 7, 2012

Weekly Progress - Still on Vacation

I need a vacation from my vacation from my vacation! 

Last week was great, until I shared a water bottle with my two year old niece. You know, one of those germy creatures? Everyone but the Dude ended up with a nasty cold. I'm still recovering, but the vacation continues with DC this week!

We went to a botanical garden outside Charlotte - gorgeous! I have picture after picture of color inspiration.

The kids, of course, were most fascinated by a frog.

  Still Big Blue's binding, but I'm on the last side! Which is good, because it needs to be done by Saturday... 

In-Progress:
Central Park Sudoku - okay, it still looks the same, but there's only one seam left on the inner sashing. Then outer, then border shopping!
 
Not mine, but I cut my sister's "Walk in the Woods" fat quarters for a Yellow Brick Road. So I think I should get credit for it. I was kind of hoping for more scraps, but this darn pattern is very efficient in cutting. Maybe there will be some scraps in the sewing process...

Quilted Enough So That I Could Baste Another Quilt:
Bad Romance & Fall-gyle - yup, that's seriously a category now. Lines go in one direction. Will finish when I get back home. Need more pins... 

Basted:
Layer Cake Quilt Along - man, some of these quilts have been backlogged for a while! This is going to take longer to quilt - I will probably just anchor it with stitch-in-the-ditch on the sashing for now. I want to do each block differently, and that will take some planning.

Swapping:
Picture-Perfect Polaroid Block Swap - a little cutesy, but I'm enjoying my Peter Rabbit fussy-cutting.

Joining:
Vintage Holiday Quilt Along - I decided to bust into my Fairy Frost collection for this. Sparkly Christmas ornaments! Even though I really don't need another Christmas quilt.

In-Progress-But-Not-This-Week
Fat Quarter Stars (6/12 blocks)
LQS Saturday Sampler 2012 (15/36 blocks)
 
In-Progress-But-Not-This-Summer
LQS Saturday Sampler 2011 (12/12 & center) 
Chunky Log Cabin (13/20 blocks)
St. Paul's Cross (2/42? blocks)

Adoption:
Application Submitted - 2/12 
Home Study - approved 5/12
USCIS paperwork - mailed 6/12
Home Study to Korea - 6/12
Referral Accepted - 6/12

New Projects: 1
Completed Projects: 0
In Progress: 12

Wednesday, July 11, 2012

WiP/FMC - New Routines

We are slowly settling into a routine here. It's actually a bit harder, since the only time the Dude is allowed at the pool is the time we avoided the pool in California. So my sewing time has to change, too. And there's a lot more distractions around with family wanting to do things! I'm managing to get some sewing time, though.

I've been binding Big Blue for fifteen minutes each day...but this week, only Thursday, Friday, Sunday and Tuesday. At a rate of 30ish" per day, I should be done with the binding in 15 days! Ugh...I should probably do more than 15 minutes a day.

Finished:

These, by the way, were the runner up layouts. I think the wave would look better with smaller blocks.

 Three In Color Order bags for a friend. Yes, I skipped the colored top. Yes, you can't really tell that the one in the back is long and skinny...about the size of a wine bottle, coincidentally.

In-Progress:
Layer Cake Snowball Fight - corners are cut, layer cake hasn't arrived yet

Central Park Sudoku - slowly piecing the nine patches as leaders/enders

Nine-Patch Snowball - nine-patches are done, snowballs are in the works

Quilting:

Joining:
Picture-Perfect Polaroid Block Swap - blocks are due immediately after I get back to Oklahoma. Insane? Yes!

In-Progress-But-Not-This-Week
Fat Quarter Stars (6/12 blocks)
LQS Saturday Sampler 2012 (12/36 blocks) 

In-Progress-But-Not-This-Summer
LQS Saturday Sampler 2011 (12/12 & center) 
Chunky Log Cabin (13/20 blocks)
St. Paul's Cross (2/42? blocks)

Adoption:
Application Submitted - 2/12 
Home Study - approved 5/12
USCIS paperwork - mailed 6/12
Home Study to Korea - 6/12

New Projects: 1
Completed Projects: 1
In Progress: 9